Acceptance Criteria
-
Acceptance Criteria define the criteria to be met for a user story to be considered implemented. They are agreed on by the Delivery Team and stakeholders and help everyone confirm what a User Story should look like when it works properly. These criteria are used to review and test if the outcome meets expectations.
-
Adaptation (Adaption)
-
Adaptation means changing your plan, process, or product when you see something isn’t working. It’s about learning from what’s happening and from feedback and then adjusting to stay on track to meet the vision.
-
Agile
-
Agile is a way of working where teams adapt and improve as they go to manage complexity. Teams work together collaboratively, use adaptive planning, and deliver in short cycles. Agility helps the team respond quickly to change and focus on what matters most.
-
Agile Manifesto
-
The Agile Manifesto is a document that lists the key values and principles behind all agile methods. It was written in 2001 by experts in agile thinking (including a representative of the Agile Business Consortium) and guides how agile teams work.
-
Agility
-
Agility means being able to think, understand what’s happening, and respond quickly to changes in your environment.
-
Ambiguity (VUCA)
-
Ambiguity means something is unclear because it can be interpreted in more than one way.
-
Artifact (Artefact)
-
An artifact is an object that represents value or helps with value delivery. Solution and Product Increments are artifacts that represent stakeholder value. All other artifacts are created to support their delivery. AgilePM uses all the basic Scrum Artifacts and adds additional Project Artifacts.
-
Assumptions
-
In the context of Project Management, assumptions are educated guesses about what will happen based on experience. They are used in planning to aid decision making when some things are uncertain. It’s important to clearly say what assumptions are being made. Discussing and questioning them helps teams challenge the assumptions and make better decisions.
-
Backlog
-
A backlog is an ordered list of work that hasn’t been done yet. It’s usually ordered by importance or priority. Examples include the Solution Backlog, Product Backlog, and Sprint Backlog.
-
Backlog Refinement
-
Backlog Refinement means regularly checking and improving the Solution or Product Backlog Items each Sprint. The Delivery Team(s) makes sure the items are clear, appropriately detailed, and in the right order before starting development, typically to meet a Definition of Ready. See also Cross-Team Refinement.
-
Baseline
-
A baseline is a starting point for comparison to measure progress in scope, time, or cost. Once it’s been set, any changes need to be agreed by the appropriate roles within the team. It helps keep the project under control and on track.
-
Benefit
-
A benefit is a measurable improvement that results from a project outcome (like saving time, increasing customer satisfaction, or improving services) that helps achieve organizational objectives.
-
Behaviour Driven Development
-
Behaviour Driven Development (BDD) is a technique pioneered by Dan North for writing Acceptance Criteria for User Stories using a “Given, When, Then” format.
-
Boundaries Of Empowerment
-
Boundaries of empowerment describe how much decision-making power a team or person has. It shows how much freedom they have to act and the point at which they must seek further permission.
-
Burn-Down Chart
-
A burn-down chart shows visually how much work is left in a Timebox and how much time is left to finish it. It helps teams see progress and plan better. They can be used at the Project (Increment) and Delivery Timebox (Sprint) levels.
-
Burn-Up Chart
-
A burn-up chart shows visually how much work has been completed and the value it brings. It helps track progress toward the final goal. They can be used at the Project (Increment) and Delivery Timebox (Sprint) levels.
-
Business Advantage
-
Business advantage (also known as competitive advantage) means doing something better than competitors, like offering a faster, cheaper, or higher-quality product or service.
-
Business Advisor
-
A Business Advisor gives expert advice on business matters related to solution development during the project. They may have responsibility for oversight of process or quality or offer specialist knowledge to help with decision-making.
-
Business Agility
-
Business agility is the ability of a whole organization to quickly respond to change and keep delivering value. It comes from people working together in creative, flexible ways to deliver the organization's core purpose. (Refer to the Agile Business Consortium’s “Framework for Business Agility” for more detail.)
-
Business Analyst
-
A Business Analyst employs a range of techniques to help the Project Organization understand emergent business and user needs and formulate a valuable solution. Business Analysts are normally involved from the start of a project through all the lifecycle phases at an appropriate level of detail.
-
Business Case
-
A Business Case explains why a project is worth doing. It shows that the solution will deliver enough value to justify the cost and risks. Whatever format is used, everyone involved needs to understand and agree with the content.
-
The Business Sponsor is the most senior Value Ownership role in a project. They are fully committed to the project, the solution, and the approach being taken. They own the Business Case and make sure the project remains viable and on track.
-
Business Value
-
Business value is the value an organization gets from a solution. This could mean more profit, market share, a better reputation, happier staff, lower costs, etc.
-
Business Visionary
-
The Business Visionary, a single individual, is a role in the Value Ownership domain, providing the big-picture view for the solution and the project. They lead the definition of the high-level outcomes required by the organization, share them with the Project Organization, and make sure the solution meets these objectives and delivers the required benefits.
-
Collaboration
-
Collaboration means people working together to reach the same goal. In the case of complex problems with unknowns, this is a necessity as the problem cannot be solved without cross-functional working and learning. Collaborative teams share knowledge, experience and ideas, helping one another to focus and succeed as a team.
-
Commitment
-
In the context of Agile Leadership, commitment is the act of pledging to meet the goal or objective, building trust within the project team.
-
Communication
-
Communication is how people share ideas or information, by talking, writing, using visuals, signs or symbols, or even body language.
-
Complexity (VUCA)
-
Complexity means something is made of many interconnected and interacting parts, making it difficult to understand, manage, or change.
-
Contingency
-
Contingency is extra time, money, or resources saved for emerging unknowns. It helps the project meet its objectives when problems or opportunities arise. In AgilePM, using MoSCoW prioritization “Could Haves” (and sometimes “Should Haves”) acts as this safety net.
-
Continuous Delivery
-
AgilePM emphasizes Delivery Teams should organize to deliver working products and solutions as regularly as possible, given their context (business and user needs, technical constraints).
-
Continuous Value Realization
-
In line with Continuous Delivery, AgilePM emphasizes that Project Teams should organize to understand the value of delivered Products and Solutions on an ongoing basis.
-
Cross-Functional
-
Being cross-functional is an essential characteristic of an agile team, where team members bring various levels of skill and expertise, but collectively as a team has all the skills it needs to get the job done.
-
Cross-Team Refinement
-
Building on Backlog Refinement, there is an additional activity every Sprint to enable cross-team alignment on the additional Project Artifacts. For example, teams may collaborate to inspect and adapt the Business Case or Delivery Plan. See also Backlog Refinement and Project Artifacts.
-
Culture
-
Culture is how a group of people think, behave, act, and work together. An agile culture values respect, flexibility, collaboration, customer-centricity and continuous improvement. The AgilePM Principles and Scrum Values support this mindset.
-
Cumulative Flow Diagram (Or Chart)
-
A Cumulative Flow Diagram (CFD) shows how work (normally as a user story) moves through different steps of a workflow e.g. analysis, design, build, test, deploy. In a Kanban system, it helps teams see if the workflow is smooth and steady.
-
Customer
-
A customer is anyone who will use or gain from the solution the project delivers, whether they buy it, use it, or benefit from it in some way. Often used interchangeably to denote a user of a solution but may be distinctly defined as the buyer.
-
Customer Value
-
Customer value is the outcome a customer gets from a product or service, typically measured by changes in customer behavior in relation to the solution. Often used interchangeably to denote user value or the value from using a solution.
Are you ready to become ITIL certified professional? Explore our relevant certification trainings and achieve the next level in Service Management profession.
-
Daily Scrum
-
The Daily Scrum is a short 15-minute event for the Developers in a Delivery Team. It is an opportunity to check progress towards the Sprint Goal, update the plan (from the Sprint Backlog), and make changes if needed. It usually happens at the same time and place every workday to keep things simple.
-
Definition Of Done (DoD)
-
The Definition of Done is a checklist that shows when something is finished to the pre-agreed standard. It makes sure the work meets all the expected criteria and quality standards before it's called complete.
-
Definition Of Ready
-
The Definition of Ready is a list of criteria that must be met in order for a Solution or Product Backlog item to be considered ready for development by a Delivery Team.
-
Dependency
-
A dependency is when one part of the project depends on another part being finished first. It could be inside the same Delivery Team or involve outside people or tasks.
-
Developer
-
A Developer is anyone working on building the solution for the project, whether they’re part of an agile Delivery Team or working alone or with other teams.
-
Delivery Phase
-
The Delivery Phase is where the Delivery Team builds the solution incrementally until it’s Done. They work in short cycles (called Sprints) and use techniques such as MoSCoW, modelling and Facilitated Workshops to help analyse, design, develop, test, and deploy the solution.
-
Domains Of Interest
-
AgilePM Project Roles fit into three Domains of Interest:
-
- Value Ownership
- Solution Delivery
- Delivery Enablement
-
Done
-
“Done” means the work has reached the quality needed and is as near to finished as the context allows. Ideally, it is ready to be delivered or used operationally. This is based on the agreed quality criteria (the Definition of Done).
-
DSDM
-
DSDM stands for Dynamic Systems Development Method. It was an agile method that brought together project management and product development. Over time, it grew to support all kinds of business solutions, not just software, in agile projects. The project management element evolved to become AgilePM.
-
Emergence (Noun)
-
Emergence means that complex solutions arise through ongoing collaboration, there are unknown needs and outcomes that cannot be predicted at the outset by understanding parts of the problem or solution. Short, iterative cycles let ideas, improvements, and an understanding of stakeholder value unfold naturally. It shows that the whole is greater than the sum of its parts, and teams learn forwards through doing, inspecting, and adapting Product Increments and ways of working.
-
Emergent (Adjective)
-
Emergent parts of a project or solution are things that appear or become clear as the project progresses. The Project Organization will respond to these changes to keep improving based on feedback and learning. See Emergence.
-
Empiricism
-
Empiricism is the belief that knowledge comes from experience and the best decisions are made based on observation. In agile, it means learning by doing and adjusting based on what you see and hear.
-
Empowerment
-
Empowerment means distributed control rather than command and control by senior roles. Agile teams are empowered to make decisions and organize based upon their knowledge and skills within defined boundaries. Empowerment is therefore related to Project Governance and typically relates to how Delivery Teams can decide how to self-manage to deliver items from a Product Backlog. Decisions that risk project delivery must be made by the Project Roles who are also empowered by the Project Sponsor.
-
Epic
-
In the context of requirements, an Epic Story is a broad, high-level requirement that represents significant value as functionality or a major business need, which must be broken down into smaller User Stories for delivery.
-
Estimating By Analogy
-
This technique uses knowledge and experience to guess the size and complexity of new work or what potential value it will bring. It is based upon the knowledge and experience of estimators and is usually used to estimate user stories during different phases of the project lifecycle. It’s a way of estimating by comparing with something you know or have done before.
-
Estimating By Decomposition
-
This means breaking a task into smaller pieces, estimating each one, then adding them together to get the total estimate. It gives a more detailed view and estimate of the work.
-
Event
-
Events are structured, timeboxed meetings in several agile frameworks including AgilePM and Scrum. These include Project Sprint Planning, Daily Scrum, Sprint Review, and Project Sprint Retrospective. The Delivery Timebox (Sprint) itself is seen as the container event.
-
External Stakeholders
-
External stakeholders are people who are not part of the Project Organization but are affected by or have influence over the project, like customers, regulators, or suppliers.
-
Facilitated Workshops
-
A structured group meeting to enable participants to reach a predetermined objective in a compressed timeframe, supported by a neutral facilitator.
-
Facilitated workshops have:
- An owner with a well-defined outcome
- The right people collaborating together
- A focus on creating artifacts or making important decisions quickly
-
It is not a chaired meeting with relatively passive attendees. A trained facilitator leads a collaborative working session by managing the process to keep the workshop focused and productive to the agreed outcome.
-
Feasibility Phase
-
The Feasibility Phase is an early check to see if the project is something that can be done (is it feasible for us?) and if it appears cost effective (is it viable, should we do it?). It looks at the goals, technology needs and know-how, costs, and management aspects to help decide if the project should go ahead.
-
Feasibility Prototype
-
A feasibility prototype is a model built to test tricky parts of a solution when research isn’t enough. It helps answer big questions and reduce risk early in the project. It’s also called a “spike.”
-
Feature
-
A feature, or feature story, is a part of a product that gives value to the user. It can be part of a bigger set of features (called an epic) that usually needs to be split into smaller, more manageable pieces of work called user stories.
-
Feedback / Feedback Loop
-
A feedback loop helps teams learn and get better by verifying (review or test) what happened in one cycle so that they can adapt and improve in the next. It can be related to delivering the solution or improving ways of working. Feedback might come from customers, stakeholders, or team discussions (like retrospectives).
-
Foundations Phase
-
The Foundations Phase does just enough to build a strong foundation for the whole project. It focuses on setting clear goals, a planned solution, and how the work will be managed from Value Ownership, Solution Delivery, and Delivery Enablement viewpoints.
-
Functional Requirement
-
A functional requirement is something a solution must do, for example, processing a payment or saving a file. It focuses on what the solution should do, not how it does it.
-
Governance
-
Governance is about ensuring we are doing the right things and in the right way. It means making sure a project follows the policies, practices, and procedures needed to ensure alignment with organizational or industry objectives and standards. It involves tracking performance, decision-making authority, and ensuring the project is done transparently, responsibly, and legally.
-
Incremental Delivery
-
Incremental delivery is about releasing parts of the product or solution one at a time, each part building on the ones before it, like the chapters of a book. Ideally, each part is ready to be used right away (meets the Definition of Done) to deliver stakeholder value.
-
Inspection
-
Inspection means regularly checking what’s been done (like documents, artifacts, or progress) to potentially adapt them. This helps to determine whether something needs to be changed or improved.
-
INVEST
-
INVEST is a checklist used to make sure User Stories are well written.
-
- Independent (standalone)
- Negotiable (can change)
- Valuable (worth doing)
- Estimable (can guess effort)
- Small (not too big to be developed alongside others in a timebox)
- Testable (can determine when it’s done)
Invest is often used to create a Definition of Ready for a User Story.
-
Iterative (Adjective)
-
Iterative means working in short cycles, learning from each cycle, and using that learning to build and improve the next one.
-
Iterative Development (Noun)
-
Iterative Development is a process in which a Product Increment evolves from a high-level concept to something with acknowledged stakeholder value. Each cycle of the process is intended to bring the part of the solution being worked on closer to completion and is always a collaborative process, typically involving two or more members of the Delivery Team.
-
Kanban
-
Kanban (Japanese word for ‘signboard’) is part of Lean and a way of managing work visually on a physical or electronic board. It helps teams see progress, manage Work in Progress (WIP), and collaborate (swarm) to solve problems quickly that might impact the flow of value (see Lean Thinking).
-
Lean Thinking
-
Lean Thinking is about managing the flow of value to the end customer. Activities not focused upon this or slowing flow are considered ‘waste’. Lean focuses on cutting out waste and focusing only on what adds value to customers. It advocates continuous improvement of ways of working and small batch delivery to capture defects early (quality) and early value realization.
-
Management By Exception
-
Management by Exception means letting teams handle day-to-day issues and only escalating more serious problems to leadership. This helps build empowerment, saves time, and keeps teams focused on their work.
-
Manifesto For Agile Software Development
-
This refers to the Agile Manifesto, which is the set of values and principles launched in 2001 that all agile methods are based on.
-
Minimum Usable Subset
-
The Minimum Usable Subset (MUST) is the smallest set of features that meets all the Must Have requirements; it can be delivered and still work properly, be safe, and meet legal standards.
-
Modelling
-
Agile Modelling uses visual, or even physical, representations to enhance communication (Principle 7), reduce ambiguity, and explore options collaboratively (Principle 3).
-
As a business analysis tool, models are used to clarify requirements, validate ideas early, reduce risk, and ensure a quality solution (Principle 4), especially when combined with workshops, timeboxing (Sprints and events).
-
Different types of models communicate different perspectives and insights:
- WHAT – Data, business rules
- HOW – Processes, features
- WHERE – Locations of activity
- WHO – Users, stakeholders
- WHEN – Events, scheduling
- WHY – Business goals and strategy
-
Agile models give focus and are lightweight, just enough to drive the right conversations and decisions.
-
MoSCoW Prioritization
-
MoSCoW Prioritization is a way to rank requirements by relative value to stakeholders within a timebox:
-
- Must Have – critical
- Should Have – important, but not essential
- Could Have – nice to have if there’s time
- Won’t Have This Time – agreed not to include in this timebox
-
This helps teams focus on what matters most and still stay flexible with timing. MoSCoW only works when applied to a timebox, e.g. a Project for Product Backlog Items or a Sprint for the items selected for the Sprint Backlog.
-
Multi-Team Sprint
-
When working at scale, with multiple Delivery Teams, AgilePM advocates a modified Sprint to support cross-team collaboration and alignment. Multi-team Sprint events and activities include:
-
- Project Sprint Planning – all Delivery Teams collaborate to plan the Sprint
- Team Sprint Planning – each Delivery Team plans their part of the Sprint
- Scrum Of Scrums – a cross-team Scrum to manage dependencies, impediments and alignment
- Cross-Team Refinement – to align and manage Project Artifacts
- Project Sprint Review – to jointly review the outcome of the Sprint
- Team Sprint Retrospective – a single Delivery Team retrospective
- Project Sprint Retrospective – a cross-team retrospective
-
Non-Functional Requirement
-
A non-functional requirement (NFR) tells us how well a system should work, like being fast, secure, or available 24/7. It’s not about what the system does, but how it performs.
-
Objective And Key Result (OKR)
-
OKRs are part of a goal-setting framework used to define ambitious, measurable goals and track their progress. This involves setting clear, inspiring objectives and then defining specific, measurable key results that indicate progress towards achieving those objectives.
-
Outcome
-
An outcome is the real-world value or benefit that accrues after a solution is used, and the impact it has on stakeholder groups. It’s about the value the stakeholders get when the solution is delivered and in use or benefits to an organization.
-
Planning Poker
-
Planning Poker is a fun and structured way for a team to estimate effort using cards with numbers. The team discusses a task, then each person picks a number card. They keep talking until they agree on the size of the work.
-
Portfolio
-
In the context of business transformation, a portfolio is a collection of projects or change initiatives. Managing a portfolio means choosing the right projects, making sure they’re all aligned with strategic objectives, and tracking them to make sure they’re adding value.
-
Pre-Project Phase
-
The Pre-project Phase happens before a project starts. It’s about checking if the project is a good idea, whether it matches business goals, and if it’s ready to begin.
-
Program
-
A program is a temporary, flexible structure that manages multiple related projects. It exists to help the organization reach strategic objectives by coordinating those projects.
-
Product
-
In the context of AgilePM, a product is anything that delivers value to users or customers. It can be physical (like a phone), digital (like software), or even a service.
-
Product Backlog
-
The Product Backlog is an emergent, ordered list of requirements of what is needed to improve the product. It is the single source of work undertaken by a Delivery Team(s) to fulfil a Product Goal.
-
Product Development
-
Product development is the process of turning an idea into a working product that people can use. It is about what the product is and how it is built and improved.
-
Product Goal
-
The Product Goal describes a future state of the product which can serve as a target for the Delivery Team to plan against. The Product Goal is in the Product Backlog (as the Commitments). The rest of the Product Backlog emerges to define “what” will fulfill the Product Goal.
-
Product Increment
-
A Product Increment is a part of the product that meets the Definition of Done and could be used right away. Each increment brings the Delivery Team closer to reaching the Product Goal.
-
Product Lifecycle Management
-
Product Lifecycle Management is about managing the journey of a product/service from the very beginning (idea) through design, use, support, and eventually, when it’s no longer needed, retirement.
-
Product Owner
-
In the context of Scrum, the Product Owner is the single person accountable for making sure the Delivery Team delivers the most value. They represent the stakeholders’ needs and manage the Product Backlog.
-
Project Approach Questionnaire
-
The Project Approach Questionnaire (PAQ) helps teams decide how well AgilePM fits a project and what risks to look at. It is filled out together, checked regularly, and helps improve how the project is run.
-
Project Artifact
-
An item, often a document or something similar to a document, that is produced to aid progress or understanding as part of the AgilePM process. An example of an AgilePM Project Artifact is the Business Case. An example of a Scrum Artifact is a Sprint Backlog.
-
Project Increment
-
A Project Increment is a container timebox made of one or more Sprints. It may end in a larger solution deployment and/or be a logical break to reassess Project viability and refine Project Artifacts, such as the Business Case or Delivery Plan.
-
Project Roles
-
Project Roles are the people who guide the overall project.
-
The roles are:
- Business Sponsor
- Business Visionary
- Solution Architect
- Project Manager
-
Project Manager
-
The Project Manager is accountable for Delivery Enablement and for keeping the project environment running smoothly. They manage the big picture, coordinate work, and support the Delivery Teams, while trusting them to handle the details.
-
Project Organization
-
The Project Organization includes everyone working on the Project, from Project Roles to Delivery Teams, and Advisors. They all contribute to building solutions.
-
Project Sprint Planning
-
Project Sprint Planning is an event where all Delivery Teams collaborate to plan a Multi-team Sprint (see Multi-team Sprint).
-
Project Sprint Review
-
A Project Sprint Review is a cross-team event to jointly review the outcome of the Sprint and collaborate on what to do next in relation to the overall project.
-
Project Team Retrospective
-
A Project Team Retrospective is a cross-team retrospective for multiple Delivery Teams and some Project Roles to reflect on the Sprint and Product Increment quality. It is not expected that the Business Sponsor will participate (see Retrospective).
-
Quality
-
Quality means the solution must work correctly and meet agreed build specifications. It is checked regularly using reviews, testing, and the Definition of Done. The AgilePM principle “Never Compromise Quality” means quality should never be sacrificed, even when under pressure to meet deadlines or cut costs.
-
Rapid Application Development (RAD)
-
RAD (Rapid Application Development) was a way to build software quickly, popularized in the 1980s and 1990s, using early working versions and fast feedback. It avoids heavy up-front design and relies on skilled developers, user input, and lots of testing.
-
Realization Phase
-
If Product and Solution Increments cannot be continuously delivered and value realized incrementally, then a distinct Realization Phase can be run.
-
The Realization Phase happens after the solution is delivered and in operational use. It is about making sure the solution really delivers the forecasted benefits over time, keeps track of performance, and makes improvements if needed.
-
This phase acknowledges that the solution will need continuous improvement after deployment to adapt to feedback from users and changes in the business environment.
-
Return On Investment (RoI)
-
Return on Investment (RoI) is a profitability metric used to evaluate how well an investment has performed. ROI is expressed as a percentage and is calculated by dividing an investment's net profit (or loss) by its initial cost or outlay.
-
Requirement
-
A requirement is something the solution is expected to include or do to solve a problem or take advantage of an opportunity. It’s often written as a User Story.
-
Retrospective
-
Often run as a Facilitated Workshop, Delivery Team(s) reflect on their recent performance and identify potential areas for improvement. Retrospectives focus on individuals and their interactions, the processes they follow, and the tools they use to achieve their collective goals.
-
As a minimum AgilePM advocates:
- A Team Sprint Retrospective for each Delivery Team
- An additional Project Retrospective for Delivery Teams to refine cross-team working
- A Project or Project Increment Retrospective for the Project Organization to refine ways of working
Quality is also considered, and the Definition of Done may be refined as an output of a Retrospective.
-
Risk
-
A risk is something that might go wrong or present as an opportunity that could impact project success. Risks often come from VUCA conditions, when things are uncertain, changing fast, or complex.
-
Scientific Management
-
Scientific Management (or Taylorism) is an approach that focuses on making work more efficient by studying and controlling tasks and workers. It’s all about improving productivity through standardization and is not empowering of individuals.
-
Scrum
-
As defined in the Scrum Guide: Scrum is a lightweight framework that helps people, teams, and organizations generate value through adaptive solutions for complex problems.
-
Scrum Artifacts
-
Scrum’s artifacts represent work or value. They are designed to maximise transparency of key information. Specifically they are the Product Backlog, Sprint Backlog, and Product Increment.
-
Scrum Guide
-
The Scrum Guide is the official reference guide for Scrum. It explains the roles, values, events, and artifacts that make up the Scrum framework. The version used in AgilePM is from 2020.
-
Scrum Master
-
The Scrum Master helps the organization and team understand and follow Scrum. They work to remove obstacles so the team can perform at its best. They focus on team improvement, not giving orders.
-
Scrum Of Scrums
-
A Scrum of Scrums is an optional cross-team Scrum to manage dependencies, impediments, and alignment. Typically staged every few days with appropriate representatives from each Delivery Team.
-
Scrum Team
-
A Scrum Team is a small, self-managing group made up of a Scrum Master, Product Owner, and Developers. The team has all the skills needed to deliver value, self-manage, and decide who does what, when, and how to achieve the team’s goals.
-
Scope
-
Scope means what’s included in the project or solution, and what’s not included. It defines the boundaries of the work. MoSCoW is a tool to manage scope.
-
Scope-Creep
-
Scope-creep happens when extra work or features are added without planning, changing the original agreed breadth of requirements (e.g. at an Epic User Story level) which could result in expansion of Solution, Product, and even Sprint Goals.
-
Self-Organization
-
Self-organization means the team takes ownership of the work. They plan together, make decisions together, and get the job done without needing a manager to tell them how. Interchangeable with self-management.
-
Service
-
A service is something that helps a customer gain some benefit, either through people, technology, or both. It’s an activity that delivers value.
-
Soft Skills
-
Soft skills are the people skills that help teams work well together, like communication, collaboration, empathy, resilience, critical thinking, problem-solving, and adaptability.
-
Solution
-
A solution is everything, products, systems, people, and services, that work together to solve a problem, meet a goal, or take advantage of an opportunity.
-
Solution Advisor
-
A Solution Advisor gives expert guidance on the technical parts of building the solution. They might oversee quality or give specialized input when needed.
-
Solution Architect
-
The Solution Architect is the design lead for the project. They make sure everything fits together logically as a coherent solution and meets the required standards. They balance new ideas with safe practices, and they keep everyone informed. (Note: This is not the same as an IT Systems Architect.)
-
Solution Backlog
-
The Solution Backlog is an emergent ordered list of everything known to be needed for the entire solution, not just one product, but everything that needs to be done to make the solution work. It will normally be used beyond the Project for the life of the Solution. An AgilePM Solution Backlog will include one or more Product Backlogs.
-
Solution Increment
-
A Solution Increment is a part of the full solution that is finished and ready to be used or deployed. It helps solve part of the stakeholders' needs.
-
Solution Goal
-
The Solution Goal describes a future state of the Solution which can serve as a target for the Project Organization to plan against. The Solution Goal can be described in the Solution Backlog.
-
Spike
-
A Spike is another name for a Feasibility Prototype, something built to test an idea or answer a specific question before building the full solution.
-
Sprint
-
A Sprint is a short, fixed period (up to a month) where a Scrum Team works together to turn ideas into working products. Each Sprint includes Sprint Planning, Daily Scrums, Sprint Reviews, and Sprint Retrospectives.
-
Sprint Backlog
-
The Sprint Backlog is a Scrum Artifact and the output of Sprint Planning. It contains the Sprint Goal, the Product Backlog Items (PBIs) to be Done, and a plan on how to do it. In AgilePM, MoSCoW prioritization is applied to the PBIs selected for the Sprint. It is a live artifact that is Inspected and Adapted at the Daily Scrum.
-
Sprint Goal
-
The Sprint Goal is the main objective that the Delivery Team wants to achieve in a Sprint. It helps everyone stay focused and work together toward a shared result.
-
Sprint Planning
-
Sprint Planning is a timeboxed event at the start of a Sprint. The Delivery Team decides what they’ll work on, why it matters, how they’ll do it, and how it helps achieve the wider solution.
-
Sprint Retrospective
-
A Sprint Retrospective is an event held at the end of a Sprint. The team looks back to see what worked, what didn’t, and decides how to improve for next time. The Definition of Done could also be iterated. The Sprint Retrospective helps increase quality and effectiveness.
-
Sprint Review
-
The Sprint Review is an event at the end of the Sprint where the Delivery Team(s) reviews the Sprint, shows Done work and collaborates on what to do next. Stakeholders give feedback, and the team updates the Product Backlog based on what they learn.
-
Stakeholder
-
A stakeholder is anyone who cares about or is affected by the project. This includes people who are involved in the work, benefit from the solution, or influence decisions.
-
Story
-
A Story is another word for a User Story, which is a way to describe a requirement from the user’s perspective.
-
Story Mapping
-
Story Mapping is a visual method pioneered by Jeff Patton to organize and understand the relationships between User Stories.
-
Story Point
-
A Story Point is a number that shows how big or complex a User Story is, compared to others. It helps teams estimate, plan, and track work, not in hours, but in relative size.
-
Story Point Estimating
-
Story Point Estimating is when the Delivery Team discusses and agrees together on the size and complexity of a Product Backlog Item using Story Points. A common technique for this consensus-based approach is Planning Poker.
-
Terms Of Reference
-
Terms of Reference (ToR) is a document that explains why the project exists, what the goals are, and why it’s worth investigating. It’s used to help decide if and how the project should move forward. Often described as an embryonic Business Case.
-
Three Cs
-
The Three Cs are a way to describe and work with User Stories:
-
- Card – a short note on an index card of the story
- Conversation – talking about what it really means
- Confirmation – the acceptance criteria to check it’s done
AgilePM adds a fourth C:
- Context – the background behind the story
-
Timebox
-
A Timebox is a set time limit to get something done. It helps keep work focused and on track. Timeboxes can be nested, for example, a project contains Project Increments, which contain Sprints.
-
Transparency
-
Transparency means making sure that everyone involved can see what’s going on, the plans, the progress, and the decisions. This helps teams inspect and adapt relevant Project Artifacts.
-
T-Shirt Estimating
-
The T-Shirt Estimating technique is a quick way to estimate how big a task is, using sizes like Small, Medium, or Large (like T-shirt sizes).
-
Uncertainty (In VUCA Context)
-
Uncertainty means not knowing exactly what will happen. It’s one of the key challenges described by VUCA.
-
User Story
-
A User Story is a way to describe a requirement from the user’s point of view, typically using the format: As a [user], I want [feature] so that [value is achieved].
-
Value Ownership Roles
-
The Value Ownership roles are concerned with representing organization, customer, and user stakeholders to ensure their needs are managed and reflected in the evolving solution.
-
The Value Ownership roles are:
- Business Sponsor
- Business Visionary
- Product Owner
-
Velocity
-
Velocity is the amount of work (normally expressed in number of Story Points) a Delivery Team thinks it can complete in the next Sprint, based on how much it delivered in past Sprints.
-
Vision Statement
-
A Vision Statement explains the big goal (desired outcome) of the project, what success looks like. It keeps everyone focused, motivated, and moving in the same direction. Typically, part of the Business Case.
-
Virtual
-
Virtual in this Reference Book means online (not in-person), e.g. virtual meetings, digital boards, or collaboration tools that help teams work together remotely.
-
Volatility (In VUCA Context)
-
Volatility means things can change suddenly and without warning. It’s one of the key challenges described by VUCA.
-
VUCA
-
VUCA stands for:
-
- Volatility – things change fast
- Uncertainty – the future isn’t clear
- Complexity – many parts interact
- Ambiguity – things can be interpreted in different ways
It describes the challenging environment most projects operate in today.
-
Waterfall
-
Waterfall is a step-by-step, linear project method where each phase (like design, build, test) is completed in a sequential order to deliver a complete solution. It’s very different from agile, which allows for iterative development and incremental delivery, which gives flexibility.
-
Wide-Band Delphi
-
Wide-band Delphi is a team-based way to estimate work. Experts give their insights and estimate independently, then the group discusses differences and agrees on the best answer.